학위논문
Highway bridge construction production rates for time estimation
표제/저자사항 Highway bridge construction production rates for time estimation / by Youngki Huh
발행사항 Ann Arbor, MI: UMI Dissertation Services, 2004
형태사항 xix, 200 p.: ill.; 23 cm
주기사항 Source: Dissertation Abstracts International, Volume: 65-08, Section: B, page: 4168.
Supervisor: James T. O'Connor.
Thesis (Ph.D.) -- The University of Texas at Austin: ., 2004.
Includes bibliographical references (p. 191-199).
표준번호/부호 ISBN 0496024337
분류기호 듀이십진분류법-> 624
출처 국립중앙도서관 바로가기
담당부서 : 국가서지과 (02-590-6339)
위로