학위논문
Crew allocation based scheduling method for modular construction project = 人力資源 配置計劃에 基盤한 工業化 建築工事 工程計劃 方案
표제/저자사항 Crew allocation based scheduling method for modular construction project = 人力資源 配置計劃에 基盤한 工業化 建築工事 工程計劃 方案 / Hosang Hyun
발행사항 Seoul : Seoul National University, 2019
형태사항 xiv, 200 pages : illustrations ; 26 cm
주기사항 Adviser: 李鉉秀
Thesis(Ph.D.) -- Graduate School of Seoul National University, Department of Achitecture & Architectural Engineering, 2019
Bibliography: pages 161-172
전자자료: http://www.riss.kr/link?id=T15397551
In English; summary in Korean
분류기호 한국십진분류법-> 540듀이십진분류법-> 720
출처 국립중앙도서관 바로가기
담당부서 : 국가서지과 (02-590-6339)
위로